Pages

Tampilkan postingan dengan label cut. Tampilkan semua postingan
Tampilkan postingan dengan label cut. Tampilkan semua postingan

Rabu, 23 November 2016

The Utility New motor First bottom panel cut

This first half of April has seen some progress on the Utility project, although not much that is visible on the actual boat itself. I ordered a new Nissan 8hp motor from onlineoutboards.com. The motor arrived very promptly... and I promptly realized I’d never operated a tiller-controlled boat before.

New 8hp Nissan Marine outboard
So, the kids and I fixed that by taking a weekend getaway at a nearby lake. I rented a 14 ft Jon boat fitted with a 9.9 hp Yamaha, and we ventured out on the water. There really is a lot to be said for the simple Jon boat. They may not be the prettiest things on the water, but it’s hard to imagine a more versatile boat in that size.

In any case, our little aluminum Jon boat was by no means a rocket on the water, but it did what it was supposed to. The Utility will have a shorter, and more streamlined hull, although somewhat heavier. I imagine performance with its 8hp motor will be similar to the 14’ Jon boat with the 9.9 Yamaha. Time will tell.

Over Easter weekend, I began the break-in period for the Nissan motor. The first two phases were to let it run at idle for 10 minutes, then to run at <50% throttle for two hours. That’s done. The next phase is to let it run at <75% throttle.

On the boat framework, I have faired down the side planking on the starboard side. I have not yet tried to fill in any of the low spots, or “hollows”, along the chine. Instead, I decided to go ahead and cut the panels for the bottom planking by cutting one sheet of Meranti in half lengthwise.

My plan is to begin dry-fitting the bottom panel into place, and to use that as a gauge to determine just how much I’ll need to fill in along the chine. It is possible that any gaps will be minor enough that thickened epoxy will do the job adequately.



Rough placement of the first bottom panel

Read More..

Minggu, 16 Oktober 2016

Quarter knees cut fitted

Today I cut out the quarter knees from a piece of mahogany. I used the transom knee from the Glen-L plans as the basis for the shape. However I had to change the corner angle to match.

Using my angle finder, I determined the transom-to-sheer corner angle to be 110°, or a 10° outward rake. (The keel-to-transom rake is 12°). Of course, theory is all fine and good... I drew it, I cut it, I planed it. I still had to re-cut it to fit. Cest la vie.

With another angle-finding tool, I determined that the vertical rake from the transom to the midline of the sheer was about 5°. So, I adjusted my planer/jointer to 5° and planed the edge of the knee that will mate to the transom. Happily, it worked great the first time. 

A little minimal corner-cleaning with a chisel, and everything fit great. Repeat for the other side.

Ive also heard these pieces referred to as "corner knees." Whatever the proper term is, I still need to finish sanding them.


Mahogany port quarter knee
Port quarter knee.

Starboard quarter knee.

This is where Im planing to install the rear cleats.


Read More..