Pages

Tampilkan postingan dengan label battens. Tampilkan semua postingan
Tampilkan postingan dengan label battens. Tampilkan semua postingan

Jumat, 27 Januari 2017

The Utility Trimming the floor battens

Some days you just dont have a lot of time to make any major progress. Still, there are usually some small things you can do to help the project along. Last night was just such an occasion. I took a few minutes to trim the forward tips of the outer floor battens. Now they match the inner battens, which Id trimmed a while back. This will look much better than the squared ends once the bottom is planked.



Read More..

Kamis, 12 Januari 2017

False battens blocking for deck framing and shiny stuff

Trying to push this project on toward completion, tonight I started measuring for the deck framing. So far, it has been mercifully simple.

I clamped my big adjustable T-Square onto the forward frame at the centerline, and measured the halfway point between the frame and the breasthook. Then, I set my 48" ruler across that halfway point, at right angles to the T-Square. After determining the rulers contact point with the sheer was an equal distance from the frame on both sides, I clamped the ruler into place, and marked the sheers. Then, I measured the angle at the intersection of the ruler and the sheer. Thankfully, it was a very easy-to-cut 20°. 

Measuring for the deck framing.

The blocking for the deck framing required a simple 20° cut. Here is the starboard side being epoxied into place.

Blocking for the deck framing on the port side.

Here, the false battens on the floor are being epoxied into place. All those boards look a little excessive to my eye, but the false battens do serve a practical purpose.

Tonight I drilled the holes & installed the stainless steel grab handle on the forward frame. The first time I rode in a Glen-L Utility, I realized this is a "must-have" item.

Progress...

Read More..

Rabu, 03 Agustus 2016

The Utility part 3 Stem and floor battens

The Utility’s stem, as with the Squirt, Zip, and I assume several other Glen-L designs, is made of 2 laminations of 3/4” plywood. Fortunately, I had enough 3/4” marine-grade Douglas Fir plywood left over from Lusitania 13’s second transom to build both the transom and the stem for the Utility. 

The laminations are glued together with marine epoxy, (I used Poxy-Shield thickened with #2 silica), and bronze screws. The breasthook is basically made the same way, although the mating pieces are shaped differently: The top piece fits over the stem, and the bottom supporting piece fits around the stem. The breasthook is then epoxied onto the stem. I clearly marked all my centerlines, and tried to make the pieces fit as precisely as possible.

With the centerline on the keel clearly marked, I clamped the Utility’s stem/breasthook assembly into position. Next, using twine and a plumb bob, I worked carefully to make sure the whole assembly was aligned with the centerline of the keel. As a one-person job, this is rather tricky. If you have someone to help, it should be much easier.

With the assembly clamped into position, I drilled two 1/4” holes vertically through the forward part of the keel and aft section of the stem, countersinking the carriage bolts. After applying copious amounts of thickened epoxy, I bolted the stem to the keel with 5” long, 1/4” bronze carriage bolts. After tightening them, I filled the extra space from the countersunk carriage bolts with thickened epoxy.



Stem clamped and bolted onto forward end of keel.

Stem-to-keel joint after epoxy. Glue blocks added for reinforcement.

Having now learned my lesson from having to build up the keel thickness, I turned to the floor battens. As I mentioned before, the frame notches for these were cut to 1” deep. “1-inch” lumber off-the-shelf is typically only 3/4” thick. So, for the floor battens, I purchased an 8-foot, “5/4” mahogany board. (After they plane 1/4” off it at the lumber yard, you’re left with an actual 1-inch thick board.) The cuts for the floor battens were straight cuts, producing four 2” wide battens. Cutting the battens produces a lot, I mean a lot, of red sawdust. I decided to sweep up & collect most of it to use as wood flour to thicken epoxy later on. This turned out to work quite well.


The floor battens had to be fitted into the transom frame notches the same as the keel. The battens were fastened on with thickened epoxy and 2” bronze screws.

Transom knees attached to keel & transom. I put these on before adding the floor battens.


A note about bronze screws

Bronze screw heads are rather soft, and will strip out on you easily. This is particularly true when using a power drill as a screwdriver. Below is the method I used to remove a stripped screw during the fitting process for the floor battens:


Totally stripped-out bronze screw head.

I cut a slot in it with my Dremel.

Removal was then easy with a flat-head screwdriver.

Read More..